Delivery in Calcasieu Parish
Large angular limestone and granite stones sized 6 to 36 inches for bank stabilization, culvert protection, and shoreline erosion control across Calcasieu Parish.
In Stock
Next-Day Delivery
Bulk delivery across Calcasieu Parish. No hidden fees.
Rip rap is the only material that holds up against real water force. This is where we deliver it most in Calcasieu Parish.
Class 1 and Class 2 rip rap holds cut banks on bayous and creeks across the parish. Common call in Moss Bluff and Carlyss.
Class 3 rip rap for Cameron Parish shoreline armoring where storm surge and tidal action destroy lighter protection year after year.
Armors detention pond outfalls and major drainage channels where concentrated flow would erode bare soil fast.
Breaks water velocity at culvert outlets so the discharge doesn't blow out the slope below the pipe.
Calcasieu River banks need Class 2 or Class 3. The current is strong and smaller stone won't hold when water is moving at flood stage.
Class 3 boulders, 24 to 36 inches, stacked for gravity retaining walls along the Calcasieu Ship Channel and industrial canal banks.
| Property | Detail |
|---|---|
| Material Type | Large angular limestone boulders |
| Class 1 Size | 6 to 12 inches |
| Class 2 Size | 12 to 24 inches |
| Class 3 Size | 24 to 36 inches |
| DOTD Compliance | Yes, all class specs |
| Coverage | Varies by class and depth |
| Weight | Approx. 1.5 tons per cubic yard |
| Application | Erosion control, bank stabilization |
Enter your project dimensions to get cubic yards and tons before you call.
Calculate rip rap for your project
Rip rap is the standard erosion control material for banks, channels, and shorelines in Calcasieu Parish. It absorbs wave energy, slows runoff velocity, and stays in place through hurricane season. No other product does all three at this price point.
The Calcasieu River, Bayou d'Inde, and dozens of drainage channels around Lake Charles all need bank stabilization. Class 1 and Class 2 rip rap are what DOTD and local drainage districts spec for these projects. We carry both and deliver to the job site.
We stock all three classes so you're not waiting on a special order. Most loads go out next day. For large commercial jobs, we can schedule multiple deliveries across the same week to keep your crew working without piling up material you can't place yet.
Call or fill out the form. Tell us the class, the linear footage you're covering, and where in Calcasieu Parish we're delivering.
One number, all-in, delivered to your bank or job site. No fuel surcharges bolted on after the fact.
Class 1 and 2 orders before noon typically go out next day. Class 3 loads may need 24 hours. We'll confirm timing when you call.
We deliver rip rap to every community in Calcasieu Parish. Next-day delivery. Call early for next-day delivery.
Rip rap is our heaviest limestone product. We also carry seven other limestone types for different applications.
General-purpose angular stone for driveways.
View Details →3/4-inch angular limestone for drainage.
View Details →Fine crushed with dust. Preferred driveway stone.
View Details →1.5 to 2-inch for heavy drainage.
View Details →3/4 to 1-inch for drainage and pipe bedding.
View Details →Pea-sized for pipe bedding and walkways.
View Details →Mixed fines and stone. Road base material.
View Details →Three DOTD classes. Class 1 runs 6 to 12 inches, Class 2 runs 12 to 24 inches, and Class 3 runs 24 to 36 inches. Class determines how much water force the stone can withstand.
Class 1 handles roadside ditches and smaller drainage channels. Class 2 for bayou banks and detention ponds. Class 3 for the Calcasieu River, the Ship Channel, and coastal Cameron Parish applications.
Yes. All three classes we stock meet Louisiana DOTD specifications for erosion control. We've supplied parish and state projects across Calcasieu.
A 100-foot bank at 3 feet wide and 2 feet deep takes about 22 cubic yards. Use the calculator on this page or call us with your dimensions and we'll figure it out for you.
Class 1 and Class 2 typically go out next day if you call before noon. Class 3 is heavy equipment and may need 24-hour scheduling. Call ahead on the big loads.
Tell us what class you need and where it's going. We'll give you one price, delivered, no hidden fees added at the end.